 +====== Grafic cost estimation mode ======
 +===== Description =====
 +With the Grafic cost estimation mode the grafic cost estimation function will be enabled. There prices, time estimates and performance texts can be assigned to the positions in the LV structure. The prices and time estimates can either be transfered to Excel or **DATAflor BUSINESS**.
  
 +For using the Grafic cost estimation mode, a LV structure in the Quick-Masses will be needed, to transfer it into an LV in BUSINESS.
 +
 +
 +===== Procedure =====
 +  - The position of the tree structure needs to be selected.
 +  - Aktivate the funktion {{:​produkte:​cad:​planung:​icon_16_businesscomp.png?​nolink|}} **Grafic**.
 + 
 +===== Functions =====
 +|<WRAP column 43%>
 +{{:​produkte:​cad:​planung:​planung2:​komp_2014.png?​nolink|}}
 +</​WRAP>​|Once the Grafic cost estimation mode is active, the LV structure will show different symbols:\\ \\ {{:​produkte:​cad:​planung:​titel-komp_2014.png?​nolink|}} **Folder**: contain other subfolders or positions. Folders that do not contain subfolders or positions can be converted into a lump-sum position in the [[Grafische Kostenschätzung]]. If a CAD objekt is assigned to a folder, the folder will automatically become a position.\\ \\ {{:​produkte:​cad:​planung:​planung2:​icon.2_2014.png?​nolink|}} **Position**:​ include associated CAD objects or converted lump-sum positions. Via the function [[Grafische kostenschätzung]] the position can be assigned with  prices, quantities and time estimates. The amount will be adopted by the assigned object or in lump-sum position automatically set to 1.\\ \\ {{:​produkte:​cad:​planung:​objekt-komp_2014.png?​nolink|}} **Object**: are from CAD and are assigned to a position or a folder by drag and drop. The folder will automatically become a position. The quantity information from the object will be adopted automatically. \\ \\ {{:​produkte:​cad:​planung:​fehler-komp_2014.png?​nolink|}} **Error**: This shows an incorrect folder or position. The folder or the position do not achieve the structure requirements for a successful transfer to BUSINESS. With {{:​produkte:​cad:​icons:​automatische_korrektur_klein.jpg?​nolink|}} **[[Fehler Anzeige]]** you can display and solve errors.|
 +
 +<WRAP round tip 90%>
 +It is still possible to add or delete other folders or items during the Grafic cost estimation mode.
 +</​WRAP>​
 +<WRAP clear></​WRAP>​
 +
 +After activating the Grafic cost estimation mode, with {{:​produkte:​cad:​icons:​dialog_grafische_kostenschaetzung_anzeigen_klein.jpg?​nolink|}} **[[Grafische Kostenschätzung]]** the individual positions can be assigned and edited with quantities, units, prices, time estimates and performance texts.
 +